One design-build team handles layout, cabinetry, permits and installation, so your kitchen is planned, priced and built without handoffs between trades.

What a kitchen remodel includes

A full rebuild of the room, not a surface refresh

A kitchen remodel rebuilds the space from the framing out. We open the walls, correct what is behind them, then set new cabinetry, surfaces, lighting and appliances against a plan drawn for how your household actually uses the room. Every project is run under a design-build contract, so the drawings, the pricing and the crew belong to one team.

  • Layout and space planning, including wall removal with engineered support
  • Custom and semi-custom cabinetry, panels and integrated appliance fronts
  • Countertops and full-height backsplashes in stone, quartz or microcement
  • Electrical, plumbing and HVAC modifications with City of Austin permits
  • Flooring, ceilings, lighting design and millwork transitions
  • Appliance coordination, hardware, paint and final finish detailing
Remodeled Austin kitchen with island seating and integrated appliance panels

Why homeowners remodel

When a kitchen is worth rebuilding

The layout fights the way you cook

Closed walls, tight walkways and a single work zone make everyday cooking slower than it should be. A remodel resets the floor plan around real traffic and prep patterns.

Storage ran out years ago

Custom cabinetry, full-height pantry runs and drawer systems recover usable space that stock cabinets waste.

Systems are past their service life

Older Austin homes often hide undersized electrical, aging supply lines and unvented ranges. Those get corrected under permit during the remodel.

The kitchen sets resale value

Kitchens are the most scrutinized room in a home sale. Durable materials and permitted work carry documentation a buyer can verify.

Planning guide

A closer look at kitchen remodeling in Austin

Start your kitchen remodel

Request a walkthrough

Prefer to call?

(737) 359-1475

What kitchen remodeling covers and why it matters

Kitchen remodeling in Austin covers everything from a cabinetry and surface replacement inside existing walls to a full reconfiguration that removes walls, relocates plumbing and rebuilds the electrical serving the room. The scope you need depends on whether the current layout works and what condition the systems behind the drywall are in.

The kitchen is also the room where construction decisions compound. Cabinet depth affects walkway width. Walkway width affects where an island can sit. Island position affects where the electrical and any gas or water lines have to run. Sequencing those decisions in the right order, before demolition, is what keeps a project from stalling mid build.

Because our team handles design and construction under one contract, the drawings are checked against what the house can actually support before pricing is finalized. That removes the common failure point where a design set is priced by a separate builder and comes back over budget.

Kitchen layouts common in Austin homes

  • Galley kitchens in older central Austin homes

    Bungalows in Hyde Park, Travis Heights and Bouldin Creek often have narrow galley kitchens closed off from living space. Opening one wall, usually non structural or supported with a flush beam, is the single change that most improves flow.

  • L-shaped kitchens with a small peninsula

    Common in 1980s and 1990s builds. Converting the peninsula to a true island adds seating and prep surface, but it requires checking clearance on all four sides before committing.

  • Open-concept kitchens in newer builds

    Layout usually works, so the remodel focuses on cabinetry quality, appliance upgrades, ventilation, lighting and finishes that hold up to daily use.

  • Kitchens in additions and ADUs

    New construction within an existing property. Scope includes framing, mechanical rough in and inspections in addition to the finish work.

  • Historic and landmark properties

    Homes inside local historic districts can carry review requirements for exterior work tied to a kitchen project, such as window changes or new venting penetrations.

Signs a kitchen is ready for a remodel

  • Two people cannot work in it at once

    Blocked walkways and a single prep zone are layout problems, not storage problems. New cabinets in the same footprint will not fix them.

  • Breakers trip when appliances run together

    Older kitchens frequently lack the dedicated circuits current code requires for small appliances, disposals and microwaves.

  • Cabinet boxes are failing, not just dated

    Soft bottoms, delaminating particleboard and sagging shelves mean refacing is not a viable option.

  • Recirculating hood instead of exterior venting

    Cooking moisture and grease that stays in the room damages finishes over time and is a common cause of persistent odor.

  • Water damage under the sink or at the dishwasher

    Ongoing leaks affect subfloor and cabinetry. Those repairs are far cheaper handled inside a planned remodel than as an emergency.

Kitchen refresh compared with a full remodel

Not every kitchen needs to be taken back to the studs. The deciding factors are the layout, the condition of the cabinet boxes and whether mechanical systems need to move.

RefreshFull remodel
LayoutUnchangedWalls, openings and work zones reconfigured
CabinetryDoors, fronts and hardware replacedNew boxes, custom sizing and full height storage
Plumbing and electricalFixtures swapped in placeCircuits, supply and drain lines relocated under permit
Typical on-site duration3 to 5 weeks8 to 14 weeks
Best whenLayout works and boxes are soundLayout fights the household or systems are outdated

What drives scope, timeline and material choices

  • Whether walls move

    Removing a load bearing wall requires engineering, a beam and inspection. It is the largest single swing in both cost and schedule.

  • Cabinetry lead time

    Custom cabinetry is usually the longest lead item. Ordering happens once selections are locked so the shop schedule and site schedule line up.

  • Appliance specifications

    Panel ready and professional ranges dictate cabinet dimensions, ventilation capacity and electrical or gas requirements. They are selected during design, not after.

  • Slab and stone availability

    Natural stone is selected from actual slabs. Templating happens after cabinets are installed, which sets a fixed gap before countertop delivery.

  • Permit and inspection timing

    City of Austin review and inspection windows are outside any contractor's control. We schedule around them and keep a written record of each milestone.

  • Condition behind the walls

    Older homes reveal knob and tube remnants, cast iron drains, or framing damage once demolition starts. We plan a contingency line for that rather than pretending it does not exist.

Permits and requirements in Austin

Straight replacement of cabinets, countertops and flooring in the same footprint generally does not require a permit. A permit is required once the work alters structure, moves plumbing or gas, or adds and relocates electrical circuits. Additions and ADUs always require permitting and inspections.

Homes within a local historic district or with a landmark designation may have additional review when a project affects the exterior. Properties served by a homeowners association can carry their own approval steps.

We prepare and submit the permit package, coordinate every inspection, and hand over the closed permit record at the end of the job. Documented, inspected work is what a future buyer's inspector and appraiser will look for.

How to think about a kitchen budget

Cost tracks scope more than square footage. A cosmetic refresh in an existing footprint, a full remodel with custom cabinetry, and a remodel that removes a load bearing wall and relocates plumbing sit at very different points, and the finish level chosen for cabinetry, stone and appliances can move a project's total substantially on its own.

Rather than quote a number that will not match your house, we give a scoped range at the walkthrough and a fixed written proposal after design and selections. Allowances are itemized so you can see exactly what is carried for cabinetry, surfaces, tile, fixtures and appliances, and what changes if a selection moves up or down.

Every house answers these questions differently. The fastest way to know where yours lands is a walkthrough.

Our process

How a kitchen project runs

  1. 01

    Walkthrough

    We visit the home, measure the kitchen and discuss goals, budget range and timing.

  2. 02

    Design and selections

    Layout options, cabinetry drawings and material selections, coordinated with your designer or ours.

  3. 03

    Proposal and permits

    A fixed scope and schedule, then permit submission where the work requires it.

  4. 04

    Construction

    Demolition through installation, run by one dedicated project manager with weekly updates.

  5. 05

    Punch and closeout

    Walkthrough, punch list, final inspections and warranty documentation.

Client Reviews

What homeowners say

  • It was a pleasure working with the team. We did a complete remodel inside and out of our East Austin home and the crafts...

    Casey M.

    1 year ago on Google

  • This is the crew you need when seeking a manager who will listen, respect your budget, and see your vision through. Our ...

    Ferdous D.

    1 year ago on Google

  • They are a wonderful company to work with. The communication about what you need is flawless and more importantly, the s...

    Eugenie B.

    1 year ago on Google

Reviews collected from verified Google homeowners.

Areas we serve

Kitchen remodeling across Austin and the surrounding area

Our shop is at 1127 Eleanor St in East Austin, and our crews work throughout Travis and Williamson County. If your neighborhood is not listed, call and we will tell you whether it falls inside our service radius.

(737) 359-1475
  • Austin
  • East Austin
  • Hyde Park
  • Clarksville
  • Tarrytown
  • Mueller
  • Bouldin Creek
  • Zilker
  • Westlake Hills
  • Rollingwood
  • Circle C
  • Barton Hills
  • Pflugerville
  • Round Rock
  • Cedar Park
  • Lakeway

Kitchen remodeling questions

How long does a kitchen remodel take in Austin?+

Most full kitchen remodels run 8 to 14 weeks on site, after design and permitting. Structural changes, custom cabinetry lead times and inspection scheduling are the usual drivers.

Do I need a permit to remodel my kitchen?+

Cosmetic replacement generally does not, but moving walls, relocating plumbing or altering electrical circuits does. We pull and manage City of Austin permits when the scope requires them.

Can I stay in the house during construction?+

Most clients do. We set containment, protect flooring, and can set up a temporary kitchen so daily routines keep working.

Do you work with my architect or designer?+

Yes. We build from outside drawings and we also provide design in house through our network of Austin architects and interior designers.

Finished white oak kitchen and dining room in a renovated Austin home

Start the Conversation

Tell us what you are thinking about

Send us the basics and a member of our team reviews it, then reaches out to set up a call. We typically reply within one business day.

Prefer to call?

(737) 359-1475